<--- Back to Details
First PageDocument Content
Construction / Building engineering / Science / United States Army Corps of Engineers / Software development process / Systems engineering process / Submittals / Design–bid–build / Quality assurance / Project management / Systems engineering / Architecture
Date: 2014-12-10 08:27:59
Construction
Building engineering
Science
United States Army Corps of Engineers
Software development process
Systems engineering process
Submittals
Design–bid–build
Quality assurance
Project management
Systems engineering
Architecture

Microsoft Word - Pike River Review Plan.docx

Add to Reading List

Source URL: www.lre.usace.army.mil

Download Document from Source Website

File Size: 103,64 KB

Share Document on Facebook

Similar Documents

Project Administrative Procedures 1) Submittals and Shop Drawings: Please prepare your submittals, shop drawings and samples in the following form: a) Catalog Cuts and Manufacturers Data: Submit six copies of catalog cut

DocID: 1vjNp - View Document

California Office of Historic Preservation Detailed Recommendations for Section 106 Consultation Submittals This document provides guidance for federal agencies consulting with the State Historic Preservation Officer (SH

DocID: 1uRF1 - View Document

Enclosure 2 Data Submittal Requirements for data that cannot be submitted via CEDEN: 1. All submittals shall be in electronic format that is PC compatible, preferably in Microsoft OfficeReferences to Web site

DocID: 1tmmy - View Document

FPB POLICY: PLAN SUBMITTALS FOR LESS THAN 21 SPRINKLERS Created: July 17, 2009 Revised: January 24, 2014 Effective Date: Immediately From the Office of the Fire Prevention Bureau – PhoneThis pol

DocID: 1tmll - View Document

FY 2017 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) PROJECT SUBMITTAL FORM Submittals are due by 4:00 p.m. on January 23, 2017 at the Office of the Laredo City Secretary 1110 Houston Street, 3rd floor A total of $717,903 i

DocID: 1tk12 - View Document