Back to Results
First PageMeta Content



Road Construction Emissions Model, Version[removed]Emission Estimates for -> Project Phases (English Units) Right Bank Slope Protection ROG (lbs/day)
Add to Reading List

Document Date: 2014-07-18 15:45:06


Open Document

File Size: 96,63 KB

Share Result on Facebook

Company

Utilities/Subgrade 1 40 ROG NOx CO / Type Project Name Right Bank Slope / Rubber Tired Dozers Rubber Tired Loaders Scrapers / Hauling Emissions ROG NOx CO / Loaders/Backhoes Trenchers Welders ROG CO / Scrapers / ROG (kgs/day) CO / ROG (lbs/day) CO / ROG NOx CO / ROG CO / Right Bank Slope / /

Event

Environmental Issue / /

Facility

Highway Tractors Off-Highway Trucks / Highway Tractors Off / Highway Tractors / Highway Trucks Other Construction Equipment Other General Industrial Equipment Other Material Handling Equipment / /

Position

General / L. Road Construction Emissions Model Data Entry Worksheet Version / Worker Worker / /

Product

PM10 PM2.5 CO2 Emission / /