<--- Back to Details
First PageDocument Content
Management / Unified Modeling Language / Business Process Model and Notation / Systems engineering / Structure / Enterprise modelling / Swim lane / Control flow / Flow / Diagrams / Process management / Design
Date: 2009-06-09 13:24:47
Management
Unified Modeling Language
Business Process Model and Notation
Systems engineering
Structure
Enterprise modelling
Swim lane
Control flow
Flow
Diagrams
Process management
Design

Add to Reading List

Source URL: bpt.hpi.uni-potsdam.de

Download Document from Source Website

File Size: 109,54 KB

Share Document on Facebook

Similar Documents

Indoor Pool (200 yards) Notes: Swimmers will be staged by race number and brought into pool by groups. Make sure to swim to one side of the lane to leave space for passing.

DocID: 1dbpS - View Document

Powder coating / Caster / Swimming / Flag / Visual arts / Diagrams / Swim lane / Unified Modeling Language

PRODUCT CATALOG Validated and Approved by the EliteSWIM (7946)

DocID: 1aaXU - View Document

Management / Systems engineering / Structure / Business Process Model and Notation / Workflow technology / XPDL / Swim lane / Business process modeling / Flow network / Diagrams / Process management / Design

ActiveModeler Avantage Foundation Users Guide © 2006, 2007, 2008 KAISHA-Tec Co. Ltd. Japan Sangyo Plaza AnnexShimo Renjaku,

DocID: 15sDl - View Document

Management / Business process / Systems engineering process / Systems science / Business / Diagrams / Swim lane / Process management / Enterprise modelling / Systems engineering

What is a Process Roadmap?

DocID: 13G8q - View Document

Swimming / Pan Pacific Swimming Championships / Sabine Gaspersz

Tuggeranong Vikings Swim Club ANNUAL QUALIFYING MEET Saturday and Sunday[removed]May[removed]Australian Institute of Sport, Bruce ACT[removed]lane, 25 metre indoor

DocID: 10NFL - View Document