Back to Results
First PageMeta Content
Building engineering / Visual arts / Computer-aided design / Data modeling / Integrated project delivery / Bim / 4D BIM / Environmental Systems Design /  Inc. / Building information modeling / Construction / Architecture


Optimize BIM to Achieve the Promise of Integrated Project Delivery By Forrest R. Lott, AIA, LEED AP Lott + Barber The Problem Recent studies show that the U.S. construction industry has not taken full advantage of availa
Add to Reading List

Document Date: 2014-11-03 09:59:42


Open Document

File Size: 20,24 KB

Share Result on Facebook

City

Savannah / /

Country

United States / /

Currency

USD / /

Facility

American Institute of Architects / U.S. National Institute of Standards and Technology / Building Information Modeling / /

IndustryTerm

energy performance / inconsistent technology adoption / 2D software / /

Organization

U.S. National Institute of Standards and Technology / Documents Committee / American Institute of Architects / /

Person

Forrest R. Lott / /

Position

contractor / team member / model manager / architect and contractor / manager for any given project / electrical engineer / project manager / /

Product

Harman On Time Radio / /

Technology

CAD / /

URL

http /

SocialTag