Back to Results
First PageMeta Content



Requirements Injection Chamber UHV chamber with one DN40CF port for ALI (facing the sample), and another for a pressure gauge (as close as possible to the sample plane).
Add to Reading List

Document Date: 2016-11-22 16:40:08


Open Document

File Size: 316,14 KB

Share Result on Facebook