Back to Results
First PageMeta Content
Architecture / New-construction building commissioning / Variable air volume / HVAC / Building automation / Duct / Fan coil unit / Air handler / Heat recovery ventilation / Heating /  ventilating /  and air conditioning / Technology / Engineering


NORTH THURSTON HIGH SCHOOL — ADDRESSING INDOOR AIR QUALITY ISSUES A project to address indoor air quality (IAQ) issues at the 19-year-old facility began in earlyThe school district was also concerned that energy
Add to Reading List

Document Date: 2008-04-16 20:20:06


Open Document

File Size: 221,88 KB

Share Result on Facebook

Company

Keithly Welsh Associates / Thurston School District Dean Martinolich Keithly Welsh Associates / /

Currency

USD / /

/

Event

Force Majeure / FDA Phase / /

Facility

General Administration Bldg. / laboratory New / New VAV terminal / Square Foot / Building Size / Technical Writing/Editing Washington State / /

IndustryTerm

annual energy savings / energy management control system / local exhaust systems / energy consumption / reduced energy consumption / energy saving opportunities / graphical user interface software / energy management control system submittals / /

NaturalFeature

University Extension Energy Program Fall / /

Organization

General Administration Division of Engineering & Architectural Services / General Administration / HIGH SCHOOL / Air Handling Unit / Washington State Department / North Thurston School District / Washington State University / /

Person

Dennis Rech / Bryan Welsh Hultz / Heating / Roger Wigfield / Dean Martinolich North / /

/

Position

Contractor / General / /

Product

Commissioning Agent / /

URL

http /

SocialTag