WORK IN PROGRESS 9 September 2013 Memo The selection of the immersed tunnel as the preferred solution Introduction

Add to Reading List

Source URL: www.femern.com

Download Document from Source Website

File Size: 157,83 KB

Share Document on Facebook

Similar Documents

Newsletter noFebruar 2012 Content International focus on Fehmarnbelt 1

Newsletter noFebruar 2012 Content International focus on Fehmarnbelt 1

DocID: 1aFD1 - View Document

WORK IN PROGRESS 9 September 2013 Memo The selection of the immersed tunnel as the preferred solution Introduction

WORK IN PROGRESS 9 September 2013 Memo The selection of the immersed tunnel as the preferred solution Introduction

DocID: 1aB86 - View Document

2 OctoberFacts about the Fehmarnbelt Tunnel (All of the following dimensions are based on the design proposal of November 2010 and may be adjusted in the final project.) Total length of immersed tunnel: 17.6 kilom

2 OctoberFacts about the Fehmarnbelt Tunnel (All of the following dimensions are based on the design proposal of November 2010 and may be adjusted in the final project.) Total length of immersed tunnel: 17.6 kilom

DocID: 170aR - View Document

2 OctoberFacts about the four contracts Building the coast-to-coast link is such a large-scale and complex project that Femern A/S has divided the civil works into four major construction contracts. Several large,

2 OctoberFacts about the four contracts Building the coast-to-coast link is such a large-scale and complex project that Femern A/S has divided the civil works into four major construction contracts. Several large,