First Page | Document Content | |
---|---|---|
Date: 2008-06-12 10:13:11Energy SERC Reliability Corporation Florida Reliability Coordinating Council PJM Interconnection Electricity market Tennessee Valley Authority Midwest Independent Transmission System Operator North American Electric Reliability Corporation Electric power Eastern Interconnection Energy in the United States | Microsoft PowerPoint[removed]elec-se-reg-des.pptAdd to Reading ListSource URL: ferc.govDownload Document from Source WebsiteFile Size: 558,02 KBShare Document on Facebook |
Duke Energy Midwest Connection RequirementsDocID: 1kAwx - View Document | |
New York’s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an “energy highway” aimed at finding ways to reliDocID: 1gAbf - View Document | |
Eastern Wind Integration and Transmission Study: Executive Summary and Project OverviewDocID: 1gpIa - View Document | |
Utility Wind Integration and Operating Impact State of the ArtDocID: 1gcKv - View Document | |
Microsoft PowerPoint - MN Wind Integration Study presentation - Dec 2006.pptDocID: 1g6Ad - View Document |