Back to Results
First PageMeta Content
California Public Utilities Commission / Safety / Energy in the United States / Pipeline and Hazardous Materials Safety Administration / San Bruno pipeline explosion / Hydrostatic test / National Transportation Safety Board / Transport / Piping / Pacific Gas and Electric Company


Status Report on NTSB Recommendations to the CPUC August 2014 NTSB Recommendation P-10-5 Develop an implementation schedule for the requirements of Safety Recommendation P[removed]Urgent) to Pacific Gas and Electric Compan
Add to Reading List

Document Date: 2014-12-10 13:30:35


Open Document

File Size: 186,36 KB

Share Result on Facebook

City

Bruno / San Bruno / /

Company

Pacific Gas and Electric Company / PG&E / /

Event

Man-Made Disaster / Product Issues / /

Facility

Pipeline Safety / /

IndustryTerm

Record search / gas pipeline systems / natural gas transmission lines / natural gas transmission pipelines / pipeline systems / intrastate natural gas transmission operators / natural gas pipeline operators / natural gas transmission operators / natural gas pipeline systems / pipeline operators / /

Organization

National Transportation Safety Board / Pipeline and Hazardous Materials Safety Administration / North Bay Division / /

Position

General / Executive Director / Director Clanon / Commissioner / /

Product

Update Application / Materials Safety Administration / /

ProvinceOrState

California / /

SocialTag