<--- Back to Details
First PageDocument Content
Construction / Base isolation / Structural system / Christchurch / Structural engineering / Civil engineering / Earthquake engineering
Date: 2012-07-10 22:59:04
Construction
Base isolation
Structural system
Christchurch
Structural engineering
Civil engineering
Earthquake engineering

[removed]Case studies The Royal Commission heard evidence from Ms Devine and from Mr Grant Wilkinson, Managing Director of Ruamoko Solutions Ltd, about three recently built or forthcoming base-isolated buildings in New Z

Add to Reading List

Source URL: canterbury.royalcommission.govt.nz

Download Document from Source Website

File Size: 263,52 KB

Share Document on Facebook

Similar Documents