<--- Back to Details
First PageDocument Content
Structural engineering / Roofs / Woodworking / Vernacular architecture / Hammerbeam roof / Medieval architecture / King post / Purlin / Truss / Structural system / Construction / Architecture
Date: 2014-05-28 08:31:20
Structural engineering
Roofs
Woodworking
Vernacular architecture
Hammerbeam roof
Medieval architecture
King post
Purlin
Truss
Structural system
Construction
Architecture

Green oak in construction 9 Case studies The case studies have been selected from a very wide range of green oak structures built over recent years in the UK to demonstrate the concepts initially set out in Chapter 2 an

Add to Reading List

Source URL: scotland.forestry.gov.uk

Download Document from Source Website

File Size: 3,47 MB

Share Document on Facebook

Similar Documents

9x12 D.I.Y. Greenhouse Instructions Mueller D.I.Y. buildings are not engineered structures and do not meet any specific building code criteriaMUELLER • www.muellerinc.com   

9x12 D.I.Y. Greenhouse Instructions Mueller D.I.Y. buildings are not engineered structures and do not meet any specific building code criteriaMUELLER • www.muellerinc.com  

DocID: 1rsmY - View Document

12x15 D.I.Y. Greenhouse Instructions Mueller D.I.Y. buildings are not engineered structures and do not meet any specific building code criteriaMUELLER • www.muellerinc.com   

12x15 D.I.Y. Greenhouse Instructions Mueller D.I.Y. buildings are not engineered structures and do not meet any specific building code criteriaMUELLER • www.muellerinc.com  

DocID: 1qWxg - View Document

Mueller6x9_greenhouse.indd

Mueller6x9_greenhouse.indd

DocID: 1pssh - View Document

Trumod Manual  PO Box 168 SpringsBoniface Road Selection Park

Trumod Manual PO Box 168 SpringsBoniface Road Selection Park

DocID: 1pace - View Document

Structural system / Timber framing / Heraldic charges / Woodworking / Metalworking hand tools / Purlin / Nipple clamp / Bow and arrow / Screw / Post / Ard / Stem

Ledgewood Greenhouse Assembly Instructions 17 & 21 Foot- Wide Begin construction. Select the orientation for the greenhouse and establish the grades. The site should be nearly level acros

DocID: 1p26Y - View Document