| | Questions and Answers NHDOT Design-Build Project Harts Location 16396A May 7, 2012 Question: 1) RFP Section 3.1.1 #7 states that the structure over the Sawyer River shall accommodate the hydraulic opening as shown on theAdd to Reading ListSource URL: www.nh.govDownload Document from Source Website File Size: 14,75 KBShare Document on Facebook
|