<--- Back to Details
First PageDocument Content
Petroleum production / Fuel gas / Inpex / Floating production storage and offloading / Liquefied natural gas / Total S.A. / Natural gas / Floating liquefied natural gas
Date: 2016-05-14 01:14:42
Petroleum production
Fuel gas
Inpex
Floating production storage and offloading
Liquefied natural gas
Total S.A.
Natural gas
Floating liquefied natural gas

MEDIA RELEASE 14 May 2016 LAST FPSO TOPSIDES LIFT A KEY STEP FOR ICHTHYS PROJECT Signifying a major step forward in the progress of the INPEX-led Ichthys LNG Project, the last topsides lift on the Floating Production, St

Add to Reading List

Source URL: www.inpex.com.au

Download Document from Source Website

File Size: 39,61 KB

Share Document on Facebook

Similar Documents

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE  FIRST NAME

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE FIRST NAME

DocID: 1vbOj - View Document

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

DocID: 1tdGe - View Document

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

DocID: 1s1gQ - View Document

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

DocID: 1rWbc - View Document

BP Statistical Review of World EnergyAugust 2014

BP Statistical Review of World EnergyAugust 2014

DocID: 1ru6D - View Document