Back to Results
First PageMeta Content
Engineering / Cartography / Civil engineering / Theodolite / Geodetic network / Triangulation / Dam / Control network / Levelling / Geodesy / Surveying / Measurement


Quality Control of a Dam Geodetic Surveying System Maria João HENRIQUES and João CASACA, Portugal Key words: Geodetic Surveying Systems, Monitoring Displacements, Quality Control. SUMMARY
Add to Reading List

Document Date: 2010-11-10 07:56:59


Open Document

File Size: 295,01 KB

Share Result on Facebook

City

Washington D.C. / Lisboa / Lisbon / Nottingham / /

Company

Maria João Henriques National Laboratory / João Casaca National Laboratory / Geodetic Networks / /

Country

Brazil / Portugal / United Kingdom / /

/

Facility

CONTACTS Maria João Henriques National Laboratory / National Laboratory / Station Point / Monte Novo dam / station PE / MEASUREMENTS National Laboratory / station PD / /

/

IndustryTerm

measurement equipment / bank / left bank / triangulation network / horizontal control network / opposite bank / control networks / /

Organization

International Congress / Dams Department of the National Laboratory for Civil Engineering / MEASUREMENTS National Laboratory for Civil Engineering / Dams Department / Applied Geodesy Division / Freemasonry / /

Person

João Casaca / Monte Novo / Maria João Henriques / /

/

Position

senior research officer / head / research officer / representative / /

ProgrammingLanguage

RC / /

ProvinceOrState

Prince Edward Island / /

Technology

control network / Av / /

SocialTag