First Page | Meta Content | |
---|---|---|
![]() | Document Date: 2007-09-08 22:23:33Open Document File Size: 1,56 MBShare Result on FacebookCityBangkok / Mandalay / Yangon / /CompanyCGGC / CCGC / /CountryThailand / Myanmar / Algeria / China / /Currencypence / /EventNatural Disaster / /FacilityDam Longitudinal Elevation / Power Intake towers / Pozzolan Testing Analyses Pozzolan Mill / Dam Isometric / Kyaukse Substation / RCC dam / Meiktila Substation / Yeywa dam / Asian Institute of Technology / /IndustryTermbank sections / partial cement replacement / chemical testing / chemical and physical testing / left bank construction works / suitable site / inclined steel penstock / cement quantities / bank / left bank / river/ right bank section / project site / steel penstocks / bank section / electro-mechanical and auxiliary equipment / /MusicAlbumThis / /NaturalFeatureMyitinge River / River Diversion Taking / Mount Popa / mountain Lower Chindwin / mountain Popa / Nam Tu River / Mount Popo / /OrganizationK. Steiger Department of Hydropower / Vietnam National Commission On Large Dams / Government of Myanmar / Department of Hydropower / Asian Institute of Technology in Bangkok / Ministry of Electric Power / Myanmar & Colenco Power Engineering Ltd / Government of China / /PersonMae Moh / Paul Fischer / Francis Turbines / /Positionpresent consultant / senior geologist / designer / experienced contractor / Location Map Project General / consultant / Lot CW2 contractor / /Regioncentral Myanmar / /URLwww.vncold.vn / /SocialTag |