<--- Back to Details
First PageDocument Content
Hydraulic engineering / Hydraulic structures / Dams / Concrete / Roller-compacted concrete / Spillway / Embankment dam / Hickory Log Creek Dam / Bruce Eastick North Para Flood Mitigation Dam / Construction / Building materials / Civil engineering
Date: 2014-01-12 11:41:56
Hydraulic engineering
Hydraulic structures
Dams
Concrete
Roller-compacted concrete
Spillway
Embankment dam
Hickory Log Creek Dam
Bruce Eastick North Para Flood Mitigation Dam
Construction
Building materials
Civil engineering

4th INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE RCC DAMS (Noviembre 2003)

Add to Reading List

Source URL: comunicacion-fccco.fcc.es

Download Document from Source Website

File Size: 217,70 KB

Share Document on Facebook

Similar Documents

SPILLWAY  SPILLWAY Water Under the Bridge?  Reliability and Conflict in

SPILLWAY SPILLWAY Water Under the Bridge? Reliability and Conflict in

DocID: 1vnUA - View Document

SPILLWAY  SPILLWAY California Water, Land, and People San Joaquin River Decision:

SPILLWAY SPILLWAY California Water, Land, and People San Joaquin River Decision:

DocID: 1v513 - View Document

SPILLWAY  SPILLWAY California Water, Land, and People

SPILLWAY SPILLWAY California Water, Land, and People

DocID: 1uPoJ - View Document

SITE-SPECIFIC PMP STUDIES AN ALTERNATIVE TO GENERALIZED PMP VALUES FOR DAM AND SPILLWAY DESIGN -----------------------------------------------------------------------------------------------------------------------------

SITE-SPECIFIC PMP STUDIES AN ALTERNATIVE TO GENERALIZED PMP VALUES FOR DAM AND SPILLWAY DESIGN -----------------------------------------------------------------------------------------------------------------------------

DocID: 1uGLO - View Document

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

DocID: 1uEb6 - View Document