<--- Back to Details
First PageDocument Content
Technology / Infrastructure / Water well / Oil well / Ice core / Drilling / Pump / Construction / Drilling rig / Drilling fluid
Date: 2002-09-30 05:56:58
Technology
Infrastructure
Water well
Oil well
Ice core
Drilling
Pump
Construction
Drilling rig
Drilling fluid

1 FRISP Report NoFuture hot water drilling on Rutford Ice StreamKeith Makinson

Add to Reading List

Source URL: folk.uib.no

Download Document from Source Website

File Size: 468,40 KB

Share Document on Facebook

Similar Documents

Daily Drilling and Scientific Report for IODP Expedition 310, Tahiti Sea Level

Daily Drilling and Scientific Report for IODP Expedition 310, Tahiti Sea Level

DocID: 1rpSx - View Document

PROPOSAL TO ALLOW RESERVE PIT CONTENTS FROM ADDITIONAL WELLS BE PUMPED DOWN A WELL

PROPOSAL TO ALLOW RESERVE PIT CONTENTS FROM ADDITIONAL WELLS BE PUMPED DOWN A WELL

DocID: 1r0Nl - View Document

Printed Matter Price No.2 COLER

Printed Matter Price No.2 COLER

DocID: 1qTo8 - View Document

Click Here JOURNAL OF GEOPHYSICAL RESEARCH, VOL. 113, B07106, doi:2007JB005447, 2008  for

Click Here JOURNAL OF GEOPHYSICAL RESEARCH, VOL. 113, B07106, doi:2007JB005447, 2008 for

DocID: 1qPj3 - View Document

Prof. Dr. Michael Korn (Univ. Leipzig)  Project: DETECTION AND LOCALIZATION OF ACOUSTIC SIGNALS FROM FLUID ASCENT CHANNELS NEAR CO2 DEGASSING SITES IN THE CHEB BASIN (WESTBOHEMIA) The West Bohemia/Vogtland region is a pl

Prof. Dr. Michael Korn (Univ. Leipzig) Project: DETECTION AND LOCALIZATION OF ACOUSTIC SIGNALS FROM FLUID ASCENT CHANNELS NEAR CO2 DEGASSING SITES IN THE CHEB BASIN (WESTBOHEMIA) The West Bohemia/Vogtland region is a pl

DocID: 1qLty - View Document