<--- Back to Details
First PageDocument Content
Electrical grid / SERC Reliability Corporation / Federal Energy Regulatory Commission / Electricity market / Florida Reliability Coordinating Council / Midwest Independent Transmission System Operator / Electric Reliability Council of Texas / Electric power / Eastern Interconnection / Energy in the United States
Date: 2012-11-09 11:01:57
Electrical grid
SERC Reliability Corporation
Federal Energy Regulatory Commission
Electricity market
Florida Reliability Coordinating Council
Midwest Independent Transmission System Operator
Electric Reliability Council of Texas
Electric power
Eastern Interconnection
Energy in the United States

Microsoft PowerPoint[removed]elec-se-reg-des

Add to Reading List

Source URL: ferc.gov

Download Document from Source Website

File Size: 686,84 KB

Share Document on Facebook

Similar Documents

IEEE TRANSACTIONS ON SMART GRID, VOL. 2, NO. 2, JUNEDigital Grid: Communicative Electrical Grids of the Future

DocID: 1v34e - View Document

GRID CODE – RULES FOR ELECTRICAL TRANSMISSION SYSTEM OPERATION GRID CODE

DocID: 1uHZl - View Document

1 Dynamic Load Altering Attacks in Smart Grid Sajjad Amini† , Hamed Mohsenian-Rad† , and Fabio Pasqualetti‡ of Electrical and Computer Engineering, University of California, Riverside, CA, USA ‡ Department of Me

DocID: 1uuPs - View Document

Energy Routing on the Future Grid: A Stochastic Network Optimization Approach Marjan Baghaie, Scott Moeller, Bhaskar Krishnamachari Department of Electrical Engineering University of Southern California, Los Angeles, 900

DocID: 1ud0N - View Document

Universal response tactics for electricity In a fire involving electrical facilities, confirm your dispatcher has notified National Grid. Work with National Grid’s on-scene representative in a unified command structur

DocID: 1u0qa - View Document