First Page | Document Content | |
---|---|---|
Date: 2007-08-16 15:49:44Energy SERC Reliability Corporation Florida Reliability Coordinating Council Tennessee Valley Authority Electricity market Midwest Independent Transmission System Operator Eastern Interconnection Electric power Energy in the United States | Microsoft PowerPoint[removed]elec-se-reg-des.pptAdd to Reading ListSource URL: ferc.govDownload Document from Source WebsiteFile Size: 552,84 KBShare Document on Facebook |
Duke Energy Midwest Connection RequirementsDocID: 1kAwx - View Document | |
New York’s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an “energy highway” aimed at finding ways to reliDocID: 1gAbf - View Document | |
Eastern Wind Integration and Transmission Study: Executive Summary and Project OverviewDocID: 1gpIa - View Document | |
Utility Wind Integration and Operating Impact State of the ArtDocID: 1gcKv - View Document | |
Microsoft PowerPoint - MN Wind Integration Study presentation - Dec 2006.pptDocID: 1g6Ad - View Document |