Nuclear technology / Nuclear energy in the United States / Nuclear safety / Fukushima Daiichi Nuclear Power Plant / Performance indicator / Fukushima Daini Nuclear Power Plant / Nuclear power / Nuclear Regulatory Commission / Fukushima disaster cleanup / Energy / Tokyo Electric Power Company / Fukushima Prefecture
Date: 2015-02-03 01:16:26
Nuclear technology
Nuclear energy in the United States
Nuclear safety
Fukushima Daiichi Nuclear Power Plant
Performance indicator
Fukushima Daini Nuclear Power Plant
Nuclear power
Nuclear Regulatory Commission
Fukushima disaster cleanup
Energy
Tokyo Electric Power Company
Fukushima Prefecture

Summary of Nuclear Safety Reform Plan Progress Report (3rd Quarter FY2014 ] ① The removal of all fuel assemblies, new and used, was completed from Fukushima Daiichi Unit 4, safely and on schedule, resulting in

Add to Reading List

Source URL: www4.tepco.co.jp

Download Document from Source Website

File Size: 146,68 KB

Share Document on Facebook

Similar Documents

Infrastructure / Entergy / Chemistry / Water / Anti-nuclear protests / Hudson River / Indian Point Energy Center / Groundwater / Tritium / Grand Gulf Nuclear Generating Station / Fukushima disaster cleanup

Update On Groundwater Monitoring And Tritium at Indian Point March 28, 2016 No harm to health or environment Engineers believe that a leak from a temporary filtration system at the Indian Point nuclear power plant was li

DocID: 1rmrK - View Document

Hygiene / Nuclear physics / Prevention / Public health / Radioactive waste / Decontamination / Operation Crossroads / Nuclear decommissioning / Nuclear Threat Initiative / Fukushima disaster cleanup / Human decontamination

7. Conclusion The Act on Special Measures Concerning Nuclear Emergency Preparedness of Japan (Law No.156, 1999) stipulated that the Nuclear Emergency Response Headquarters under the Cabinet Office was responsible for p

DocID: 1qyzY - View Document

Fukushima Daiichi nuclear disaster / Chemistry / Nuclear physics / Nature / Tritium / Tokyo Electric Power Company / Fukushima disaster cleanup / Groundwater

Reference (2) July 26, 2013 Tokyo Electric Power Company Chronology of events concerning disclosure on the discharge of contaminated water into the bay

DocID: 1quv8 - View Document

Hygiene / Radioactive waste / Civil defense / Safety / Security / Human decontamination / Decontamination / Radioactive contamination / Operation Crossroads / Nuclear decommissioning / Fukushima disaster cleanup / Japanese reaction to Fukushima Daiichi nuclear disaster

FY2014 Decontamination Report - A compilation of experiences to date on decontamination for the living environment conducted by the Ministry of the Environment - (Tentative Translation)

DocID: 1oxwx - View Document

Energy conversion / Fukushima Prefecture / Nuclear fuels / Spent fuel pool / Nuclear reactor / Nuclear power plant / Nuclear power / Spent nuclear fuel / Fukushima disaster cleanup / Energy / Nuclear technology / Radioactive waste

December 21, Provisional Translation] Mid-and-long-Term Roadmap towards the Decommissioning of Fukushima Daiichi Nuclear Power Units 1-4, TEPCO(Digest Version) 1.