Back to Results
First PageMeta Content
Oilfield terminology / Technology / Completion / Casing / Annulus / Well logging / Drilling fluid / Wellhead / Injection pump / Oil wells / Petroleum / Petroleum production


Appendix A - Well Construction Requirements
Add to Reading List

Document Date: 2015-01-05 15:08:07


Open Document

File Size: 296,58 KB

Share Result on Facebook

City

Denver / /

Company

Nautilus Poplar LLC / /

Event

FDA Phase / /

Facility

Fort Peck Assiniboine / Fort Peck Tribes' Comprehensive Code / /

IndustryTerm

conventional oil / gas plants / oil field barrels / cement bond log / cement / gas plant cooling tower cleaning wastes / shut-off device / natural gas production / /

NaturalFeature

MT OEP / /

Organization

Deb Madison Environmental Programs Manager office of Environmental Protection Fort Peck Assiniboine / Fort Peck Assiniboine and Sioux Tribes' office of Environmental Protection / U.S. Securities and Exchange Commission / Environmental Protection Agency / There / /

Position

Director at the conclusion / Director a notice / Director / representative / Director at least seven calendar days / Director in order / /

Product

Underground Injection / Testing Injection / Maximum Allowable Injection / APPENDIX C. Injection / operation / tubing / interval / Class / well / /

ProgrammingLanguage

C / /

ProvinceOrState

R51E Roosevelt County / SWD Roosevelt County / Colorado / Michigan / /

PublishedMedium

Parameters / /

Technology

fracturing / /

SocialTag