Installation testing

Results: 155



#Item
1JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM/BENTENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF “ASYNCHRONOUS AC ENGINE TEST BED” FOR ENGINE PERFORMANCE TESTING LABORATORY (MAKMAL

JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM/BENTENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF “ASYNCHRONOUS AC ENGINE TEST BED” FOR ENGINE PERFORMANCE TESTING LABORATORY (MAKMAL

Add to Reading List

Source URL: perolehan.utem.edu.my

- Date: 2015-09-12 03:55:16
    2Clarification of tender No: Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Access Control System at Export Processing Zones Authority, Athi-River EPZ-Machakos County QUESTION Usag

    Clarification of tender No: Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Access Control System at Export Processing Zones Authority, Athi-River EPZ-Machakos County QUESTION Usag

    Add to Reading List

    Source URL: www.epzakenya.com

    Language: English - Date: 2017-06-27 13:53:59
      3JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM052/PERALATAN MAKMAL/2017 QUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISIONING OF IMPACT TESTING EQUIPMENT FOR MAKMAL PENGUJIAN BAHAN, FAKULTI TEKNOLOGI KEJURUT

      JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM052/PERALATAN MAKMAL/2017 QUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISIONING OF IMPACT TESTING EQUIPMENT FOR MAKMAL PENGUJIAN BAHAN, FAKULTI TEKNOLOGI KEJURUT

      Add to Reading List

      Source URL: perolehan.utem.edu.my

      Language: Indonesian - Date: 2017-08-29 04:58:12
        4JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM051/PERALATAN MAKMAL/2017 QUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISIONING OF PLASTIC EXTRUDER MACHINE FOR DEPARTMENT OF MANUFACTURING ENGINEERING TECHNOLOG

        JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM051/PERALATAN MAKMAL/2017 QUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISIONING OF PLASTIC EXTRUDER MACHINE FOR DEPARTMENT OF MANUFACTURING ENGINEERING TECHNOLOG

        Add to Reading List

        Source URL: perolehan.utem.edu.my

        Language: Indonesian - Date: 2017-08-23 21:20:55
          5JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM010/ PERALATAN DAN KELENGKAPAN PERUBATANQUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF DENTAL INTRAORAL X-RAY MACHINE AND INTRAORAL X-RAY SCANN

          JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM010/ PERALATAN DAN KELENGKAPAN PERUBATANQUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF DENTAL INTRAORAL X-RAY MACHINE AND INTRAORAL X-RAY SCANN

          Add to Reading List

          Source URL: perolehan.utem.edu.my

          - Date: 2017-09-25 02:51:00
            6JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM/BENTENDER FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF SELECTIVE LASER SINTERING (PLASTIC) SYSTEM FOR AUTOMOTIVE CHASSIS TECHNOLOGY LAB,

            JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM/BENTENDER FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF SELECTIVE LASER SINTERING (PLASTIC) SYSTEM FOR AUTOMOTIVE CHASSIS TECHNOLOGY LAB,

            Add to Reading List

            Source URL: perolehan.utem.edu.my

            Language: Indonesian - Date: 2016-10-10 21:58:00
              7JADUAL PAPARAN HARGA NO. TENDER: UTeM/BENTENDER TO SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF CO2 LASER PROCESSING MACHINE FOR THE MACHINE SHOP LABORATORY, FAKULTI KEJURUTERAAN

              JADUAL PAPARAN HARGA NO. TENDER: UTeM/BENTENDER TO SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF CO2 LASER PROCESSING MACHINE FOR THE MACHINE SHOP LABORATORY, FAKULTI KEJURUTERAAN

              Add to Reading List

              Source URL: perolehan.utem.edu.my

              Language: Indonesian - Date: 2016-10-10 21:56:39
                8Office of the Fire Commissioner Codes and Standards - Fire Safety Inspections Standardized Labels Required for Fire Protection Equipment/Life Safety Installation Inspection, Testing and Cleaning Date Issued: January 8, 2

                Office of the Fire Commissioner Codes and Standards - Fire Safety Inspections Standardized Labels Required for Fire Protection Equipment/Life Safety Installation Inspection, Testing and Cleaning Date Issued: January 8, 2

                Add to Reading List

                Source URL: www.firecomm.gov.mb.ca

                Language: English - Date: 2016-01-08 17:29:49
                  9JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM024/KELENGKAPAN MAKMAL/2017 QUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF ENGINE SYSTEM WITH STAND FOR JABATAN TEKNOLOGI KEJURUTERAAN MEKANIKAL, FAKU

                  JADUAL PAPARAN HARGA NO. SEBUT HARGA: UTeM024/KELENGKAPAN MAKMAL/2017 QUOTATION FOR SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF ENGINE SYSTEM WITH STAND FOR JABATAN TEKNOLOGI KEJURUTERAAN MEKANIKAL, FAKU

                  Add to Reading List

                  Source URL: perolehan.utem.edu.my

                  - Date: 2017-08-18 04:45:49
                    10TECHNICAL BID Technical Specification for DC Power Supply of maximum 300 Volt, Amp. 1. Scope of work The scope of this tender includes design, manufacturing, factory testing, delivery, installation, commissioning,

                    TECHNICAL BID Technical Specification for DC Power Supply of maximum 300 Volt, Amp. 1. Scope of work The scope of this tender includes design, manufacturing, factory testing, delivery, installation, commissioning,

                    Add to Reading List

                    Source URL: www.cppipr.res.in

                    Language: English - Date: 2017-01-06 10:23:26