Back to Results
First PageMeta Content
Construction / Bridges / Engineering / Architecture / Cable-stayed bridge / Structural steel / Ironworker / High-tech architecture / Gerald Ratner Athletics Center / Structural engineering


$25M or greater, but less than $100M National Winner
Add to Reading List

Document Date: 2009-06-17 13:26:02


Open Document

File Size: 94,54 KB

Share Result on Facebook

City

Carson / Chicago / /

Company

LeJeune Steel Company / Chicago Steel Fabricator LeJeune Steel Company / Owner University of Chicago Design Architect Cesar Pelli & Associates Inc. / Steel Detailer Pacific Drafting Inc. / Minneapolis (AISC member) Steel Erector Danny’s Construction Company Inc. / Chicago General Contractor Walsh Construction Company Inc. / /

Continent

Europe / /

Country

Germany / United States / /

Currency

USD / /

Facility

University of Chicago Gerald Ratner Athletics Center / /

IndustryTerm

structural solution / project site / restrictive site / long-span metal roof deck / transportation energy costs / steel / /

Organization

Owner University of Chicago Design / University of Chicago / Ratner Center / /

Position

CN Architect / /

Technology

3-D / /

URL

www.modernsteel.com / /

SocialTag