Back to Results
First PageMeta Content
United States Environmental Protection Agency / Air pollution / Energy in the United States / Not-To-Exceed / Acid Rain Program / Emission standard / Title 40 of the Code of Federal Regulations / Diesel fuel / Heat recovery steam generator / Pollution / Energy / Environment


STATE OF UTAH Department of Environmental Quality Division of Air Quality APPROVAL ORDER: Approval for Lake Side Power Plant Prepared By: John D. Jenks, Engineer
Add to Reading List

Document Date: 2014-03-25 16:34:21


Open Document

File Size: 614,83 KB

Share Result on Facebook

City

DAQE / Allis / /

Company

Richard W. Sprott Executive Secretary Utah / C. Two (2) CO / NOx and CO / UT 84058 Corporate Office Location Summit Vineyard LLC C / Site Office Summit Vineyard LLC / Siemens / lb/MMBtu CO. / Summit Vineyard LLC / /

Country

United States / /

/

Event

Man-Made Disaster / FDA Phase / Environmental Issue / Reorganization / /

Facility

Lake Side Power Plant / Mine Safety and Health Administration / Geneva Steel facility / /

/

IndustryTerm

continuous monitoring systems / air pollution control equipment / natural gas combustion exhaust stacks / gas turbine / natural gas / plant-gas turbines / public utilities / electricity producing operation / continuous emissions monitoring devices / fuel oil / source test protocol / gas turbine engine / /

Movie

Page 3 2 / /

Organization

Mine Safety and Health Administration / Division of Air Quality / OF UTAH Department of Environmental Quality Division of Air Quality APPROVAL ORDER / Occupational Safety and Health Administration / Environmental Protection Agency / /

Person

Tom Cameron / John D. Jenks / /

/

Position

Executive Secretary / attn /

Product

D-4294-89 / SO2 / AN3031001-05 / /

ProvinceOrState

Utah County / Wisconsin / /

Technology

pollution control / source test protocol / /

SocialTag