<--- Back to Details
First PageDocument Content
Ariane 5 / International Space Station / Collision avoidance / Jules Verne ATV / Johannes Kepler ATV / Spaceflight / European Space Agency / Automated Transfer Vehicle
Date: 2010-04-16 12:53:45
Ariane 5
International Space Station
Collision avoidance
Jules Verne ATV
Johannes Kepler ATV
Spaceflight
European Space Agency
Automated Transfer Vehicle

Key Mission Data MISSION

Add to Reading List

Source URL: esamultimedia.esa.int

Download Document from Source Website

File Size: 1,56 MB

Share Document on Facebook

Similar Documents

Panel Space Debris Risk for Aviation P.Wilde, F.Alby Planned and Unplanned Reentries

Panel Space Debris Risk for Aviation P.Wilde, F.Alby Planned and Unplanned Reentries

DocID: Z7j5 - View Document

A Space Debris Alert System for Aviation US Patent pending Inventor: T. Sgobba - ESA Independent Safety Office  Re-entry breakup basics

A Space Debris Alert System for Aviation US Patent pending Inventor: T. Sgobba - ESA Independent Safety Office Re-entry breakup basics

DocID: Z2zg - View Document

Virginie Hager mit den Astronauten André Kuipers und Paolo Nespoli ATV-1 „Jules Verne“ im All  ALS DLR-TRAINEE ZUR ESA

Virginie Hager mit den Astronauten André Kuipers und Paolo Nespoli ATV-1 „Jules Verne“ im All ALS DLR-TRAINEE ZUR ESA

DocID: Sl5h - View Document

FACT SHEET ATV: Automated Transfer Vehicle The ATV is Europe’s indispensable space supply ferry, capable of carrying up to 6.6 tonnes of cargo to the International Space Station (ISS). The first ATV delivered 4.5 tonne

FACT SHEET ATV: Automated Transfer Vehicle The ATV is Europe’s indispensable space supply ferry, capable of carrying up to 6.6 tonnes of cargo to the International Space Station (ISS). The first ATV delivered 4.5 tonne

DocID: R7s3 - View Document

Instrumentation and Requirements for Re-entry Observation Campaign (ATV- 5) Stefan L¨ohle, Thomas Marynowski, Fabian Zander IRS-14-P01 This document gives a short summary of the ATV-5 Instrumentation and Requirements fo

Instrumentation and Requirements for Re-entry Observation Campaign (ATV- 5) Stefan L¨ohle, Thomas Marynowski, Fabian Zander IRS-14-P01 This document gives a short summary of the ATV-5 Instrumentation and Requirements fo

DocID: BsqW - View Document