Back to Results
First PageMeta Content
Vernon /  Vermont / Nuclear power plant / Diesel generator / Nuclear power / Diesel locomotive / Power station / New England Coalition / Energy / Entergy / Vermont Yankee Nuclear Power Plant


Microsoft Word - DOCS-#[removed]v8-Prefiled Testimony of John Goodell.docx
Add to Reading List

Document Date: 2014-10-10 19:32:44


Open Document

File Size: 36,58 KB

Share Result on Facebook

Company

SVE Associates / Entergy Nuclear Operations Inc. / Entergy Nuclear Vermont Yankee LLC / Entergy 10 Nuclear Operations Inc. / /

Event

Environmental Issue / Product Issues / /

Facility

North Warehouse building / The VY Station / VY Station / Vermont Yankee Nuclear Power Station / North Warehouse / tearing down the existing North Warehouse building / /

IndustryTerm

greenhouse gas impacts / greenhouse gas emissions / construction site / construction equipment / underground utilities / gas impacts / underground oil storage tank / gallon above-ground oil storage tank / underground fuel oil storage tank / /

NaturalFeature

Connecticut River / /

Organization

Federal Emergency Management Agency / Nuclear Regulatory Commission / Vermont Agency of Natural Resources / Control Division / VDEC’s Water Supply Division / Vermont Department of Environmental Conservation / Department of Health / Environmental Protection Agency / /

Person

JOHN GOODELL / George Thomas / /

Position

civil engineer / licensed professional engineer / /

Product

material / /

ProvinceOrState

Vermont / Connecticut / /

Technology

VY protocols / Pollution Control / /

SocialTag