Back to Results
First PageMeta Content
Spotted flagtail / Flagtail / Translocation / Frog / Zacco / Heinrich Kuhl / Biology / Zoology / Cyprinidae / Kuhlia / Parazacco


Drainage improvement in South Lantau and Construction of Mui Wo Village Sewerage Phase 1 – Construction phase EM&A Proposal for fauna capture survey and translocation 1.1
Add to Reading List

Document Date: 2008-12-03 20:06:47


Open Document

File Size: 4,46 MB

Share Result on Facebook

Country

Indonesia / China / Japan / Vietnam / /

Event

Employment Change / /

IndustryTerm

capture site / /

NaturalFeature

Pak Ngan Heung River / Luk Tei Tong River / Butterfly Hill / Tai Tei Tong River / River Bypass Channel / /

Organization

IUCN / Kuhliidae / /

Person

Tai Tei Tong / Lai Chi Sing / /

Position

The Fish Ecologist / Personnel Fish Ecologist of the Environmental Team / Fish Ecologist / Personnel Herpetofauna Ecologist of the Environmental Team / qualified Fish Ecologist / ecologist / Fish Ecologist of the Environmental Team / ET Leader / Director / Engineer / Herpetofauna Ecologist / Director / the proposal / /

Region

South China / East Asia / /

URL

http /

SocialTag