Kashiwazaki

Results: 105



#Item
51Mar. 12, 2012 Tokyo Electric Power Company On July 22, 2011, TEPCO conducted the first-stage of a two-stage comprehensive assessment concerning safety (Stress Test) on Units 1 and 7 at the Kashiwazaki-Kariwa Nuclear Powe

Mar. 12, 2012 Tokyo Electric Power Company On July 22, 2011, TEPCO conducted the first-stage of a two-stage comprehensive assessment concerning safety (Stress Test) on Units 1 and 7 at the Kashiwazaki-Kariwa Nuclear Powe

Add to Reading List

Source URL: www.tepco.co.jp

Language: English - Date: 2012-03-17 08:22:06
52Site Layout of Kashiwazaki Kariwa Nuclear Power Station Total Area of KK N.P.S: approx. 4.2 km2 <Reference> February 17, 2015

Site Layout of Kashiwazaki Kariwa Nuclear Power Station Total Area of KK N.P.S: approx. 4.2 km2 <Reference> February 17, 2015

Add to Reading List

Source URL: www4.tepco.co.jp

- Date: 2015-02-19 02:38:56
    53<Reference>  Outline of Niigata Headquarters    1. Establishment: April 1, 2015  2. Location: 11‐7 Shinko‐cho, Chuo‐ku, Niigata‐City, Niigata‐Prefecture  3. Representative: Koichi Kimur

    <Reference>  Outline of Niigata Headquarters    1. Establishment: April 1, 2015  2. Location: 11‐7 Shinko‐cho, Chuo‐ku, Niigata‐City, Niigata‐Prefecture  3. Representative: Koichi Kimur

    Add to Reading List

    Source URL: www.tepco.co.jp

    Language: English - Date: 2015-03-19 01:26:04
    54国際社会 技術力・ ノウハウの向上 Annual Report 2012 Year ended March 31, 2012

    国際社会 技術力・ ノウハウの向上 Annual Report 2012 Year ended March 31, 2012

    Add to Reading List

    Source URL: www.tepco.co.jp

    Language: English - Date: 2012-09-24 00:21:32
    55Judo Workshop Train with the Best! Perth, December 2009 Workshop Details

    Judo Workshop Train with the Best! Perth, December 2009 Workshop Details

    Add to Reading List

    Source URL: www.judowa.org.au

    Language: English - Date: 2009-10-30 00:01:19
    56Principal Research Results  Numerical Simulation for Overflow Behavior of Water from Spent Fuel Pool with Sloshing in the 2007 Niigata-ken Chuetsu-oki Earthquake Background In order to evaluate overflow behavior of water

    Principal Research Results Numerical Simulation for Overflow Behavior of Water from Spent Fuel Pool with Sloshing in the 2007 Niigata-ken Chuetsu-oki Earthquake Background In order to evaluate overflow behavior of water

    Add to Reading List

    Source URL: criepi.denken.or.jp

    Language: English - Date: 2009-03-04 02:31:15
    57Niigata Prefecture Press Release Niigata Prefectural Bureau of Disaster Prevention (as of February 18, 2015) Report of environmental radiation monitoring results in Niigata Prefecture As of 14:20 on February 18

    Niigata Prefecture Press Release Niigata Prefectural Bureau of Disaster Prevention (as of February 18, 2015) Report of environmental radiation monitoring results in Niigata Prefecture As of 14:20 on February 18

    Add to Reading List

    Source URL: www.pref.niigata.lg.jp

    Language: English - Date: 2015-02-19 04:59:41
    58【Nuclear Power Equipment】 № Category  Item Name

    【Nuclear Power Equipment】 № Category Item Name

    Add to Reading List

    Source URL: www4.tepco.co.jp

    Language: English - Date: 2014-07-22 20:16:40
    59【Nuclear Power Equipment】 № Category  Item Name

    【Nuclear Power Equipment】 № Category Item Name

    Add to Reading List

    Source URL: www.tepco.co.jp

    Language: English - Date: 2014-07-22 20:16:40
    60A newsletter of the Division of Nuclear Power Vol. 2, No. 4, December 2005 http://www.iaea.org/OurWork/ST/NE/NENP/index.html Contents •

    A newsletter of the Division of Nuclear Power Vol. 2, No. 4, December 2005 http://www.iaea.org/OurWork/ST/NE/NENP/index.html Contents •

    Add to Reading List

    Source URL: www-pub.iaea.org

    Language: English - Date: 2005-12-12 11:05:36