<--- Back to Details
First PageDocument Content
Rail Baltica / Rail transport in Estonia / Rail transport in Latvia / Rail transport in Poland / Interreg / Spatial planning / Tallinn / Infrastructure / Baltic region / Europe / Baltic Sea / European Union
Date: 2011-10-14 07:43:58
Rail Baltica
Rail transport in Estonia
Rail transport in Latvia
Rail transport in Poland
Interreg
Spatial planning
Tallinn
Infrastructure
Baltic region
Europe
Baltic Sea
European Union

Evaluation of implementation of the VASAB 2010 vision in the area of mobility network and energy supply Contract: ,

Add to Reading List

Source URL: www.vasab.org

Download Document from Source Website

File Size: 152,03 KB

Share Document on Facebook

Similar Documents

Helsinki-Uusimaa at the crossroads of TEN-T and challenges of accessibility Olli Keinänen, chief adviser Helsinki-Uusimaa Regional Council CPMR, Baltic Sea Commission, transport wg

Helsinki-Uusimaa at the crossroads of TEN-T and challenges of accessibility Olli Keinänen, chief adviser Helsinki-Uusimaa Regional Council CPMR, Baltic Sea Commission, transport wg

DocID: 1oz3q - View Document

AUSTATUD RIIGIKOGU LUGUPEETUD RIIGIKOGU LIIKMED Esitame Teile kollektiivse pöördumise taotlusega, et Riigikogu teeks avalduse Rail Baltica peatamiseks. Teeme ettepaneku võtta Riigikogu avalduse aluseks meie poolt esit

AUSTATUD RIIGIKOGU LUGUPEETUD RIIGIKOGU LIIKMED Esitame Teile kollektiivse pöördumise taotlusega, et Riigikogu teeks avalduse Rail Baltica peatamiseks. Teeme ettepaneku võtta Riigikogu avalduse aluseks meie poolt esit

DocID: 1eIem - View Document

Joint political statement of Euroregion Baltic Council regarding the ongoing revision of the TEN transport corridors in Europe On 5th March 2010 the Council of Euroregion Baltic unanimously adopted this political stateme

Joint political statement of Euroregion Baltic Council regarding the ongoing revision of the TEN transport corridors in Europe On 5th March 2010 the Council of Euroregion Baltic unanimously adopted this political stateme

DocID: 1759e - View Document

Evaluation of implementation of the VASAB 2010 vision in the area of mobility network and energy supply Contract: ,

Evaluation of implementation of the VASAB 2010 vision in the area of mobility network and energy supply Contract: ,

DocID: 16WLS - View Document

ang 24039_Raport_RBGC_13 11 12

ang 24039_Raport_RBGC_13 11 12

DocID: 16Tk8 - View Document