Back to Results
First PageMeta Content
Franklin County /  Vermont / Grand Isle County /  Vermont / Lamoille County /  Vermont / Vermont Electric Cooperative / The Substation / Vermont / Addison County /  Vermont / Chittenden County /  Vermont


STATE OF VERMONT PUBLIC SERVICE BOARD PSB Docket No. ______ Petition of Vermont Electric Cooperative, Inc. (VEC) pursuant to 30 V.S.A. § 248 for a Certificate of Public Good authorizing VEC to:
Add to Reading List

Document Date: 2014-01-10 15:51:19


Open Document

File Size: 154,37 KB

Share Result on Facebook

City

Cambridge / /

Company

Kris Smith Vermont Electric Cooperative Inc. / Vermont Electric Cooperative Inc. / Vermont 4 Electric Cooperative Inc. / Energy Management Systems / /

Currency

USD / /

Event

Environmental Issue / Product Issues / Natural Disaster / /

Facility

Derby Substation / The Existing Substation / Fairfax Substation / Madonna Substation / VEC’s Cambridge Substation / Substation Site Plan / New Substation / Smuggler’s Notch Operation Center / VEC’s Madonna Substation / Existing Substation / /

IndustryTerm

secure site / physical equipment / suitable site / transportation systems / oil containment plans / adequate secondary oil containment system / suitable substation building site / oil / transformer oil containment / educational and municipal services / greenhouse gas impacts / concrete oil containment system / oil containment / oil containment basin / electrical energy / oil volume / /

NaturalFeature

Brewster River / /

Organization

Public Service Board / Public Service / Vermont Agency of Transportation / Smuggler’s Notch Operation Center / /

Person

Adam Crary / KRIS SMITH / Madonna / /

Position

Manager / Manager of Engineering / /

Product

Materials / /

ProgrammingLanguage

DC / /

ProvinceOrState

Vermont / /

SocialTag