<--- Back to Details
First PageDocument Content
East Rail Line / Lok Ma Chau / Kowloon–Canton Railway / Lo Wu / Sheung Shui Station / Lok Ma Chau Station / Shenzhen / Lok Ma Chau Spur Line Control Point / North–South Line / Hong Kong / Closed Area / Lok Ma Chau Spur Line
Date: 2005-10-19 23:03:18
East Rail Line
Lok Ma Chau
Kowloon–Canton Railway
Lo Wu
Sheung Shui Station
Lok Ma Chau Station
Shenzhen
Lok Ma Chau Spur Line Control Point
North–South Line
Hong Kong
Closed Area
Lok Ma Chau Spur Line

Microsoft Word - tp_rdp1119cb1-266-1e

Add to Reading List

Source URL: www.legco.gov.hk

Download Document from Source Website

File Size: 19,36 KB

Share Document on Facebook

Similar Documents

Asia – North America PS1: Pacific South 1 PORT ROTATION ORIGIN

Asia – North America PS1: Pacific South 1 PORT ROTATION ORIGIN

DocID: 1veRk - View Document

Asia – North America PS6: Pacific South 6 PORT ROTATION  (Terminals are subject to change)

Asia – North America PS6: Pacific South 6 PORT ROTATION (Terminals are subject to change)

DocID: 1uYCb - View Document

From the South (I-95 and I-24), Red Line (Rt-3, I-93 – best from Cape Cod): Rt 3 to 93 north Take Exit 11 for Granite Blvd At the McDonald’s, take a left onto 203 (Gallivan Blvd) Stay on 203 all the way to Arborway w

From the South (I-95 and I-24), Red Line (Rt-3, I-93 – best from Cape Cod): Rt 3 to 93 north Take Exit 11 for Granite Blvd At the McDonald’s, take a left onto 203 (Gallivan Blvd) Stay on 203 all the way to Arborway w

DocID: 1tS13 - View Document

Green Line to the Airport Scoping Meetings December 1, 2, and 3, 2015 North Natomas, Downtown Sacramento, and South Natomas  Executive Summary

Green Line to the Airport Scoping Meetings December 1, 2, and 3, 2015 North Natomas, Downtown Sacramento, and South Natomas Executive Summary

DocID: 1sBQR - View Document

CSAH 9 RECONSTRUCTION – PHASE 2 S.A.PPROJECT UPDATE – APRIL 27, 2015 Scope:  Complete highway reconstruction from just north of South Pelican Drive to Becker County Line  2.248 miles

CSAH 9 RECONSTRUCTION – PHASE 2 S.A.PPROJECT UPDATE – APRIL 27, 2015 Scope:  Complete highway reconstruction from just north of South Pelican Drive to Becker County Line  2.248 miles

DocID: 1sB5d - View Document