Back to Results
First PageMeta Content
Mathematical physics / Grayling /  Michigan / Traffic congestion / Traffic flow / M-93 / Benefit-cost ratio / M-72 / Transport / Geography of Michigan / Road transport


Grayling Region I-75 Access Project TIGER Grant Application Benefit Summary Matrix Current Status/Baseline & Problem to be Addressed Changes to Baseline
Add to Reading List

Document Date: 2014-04-24 15:33:23


Open Document

File Size: 376,61 KB

Share Result on Facebook

Company

URS / State Street North Down / Northwest Design Group Inc. / /

Currency

USD / /

Event

FDA Phase / /

Facility

Half interchange / Bridge Road Response Safety NDRR Bridge Improvements Improvements Intersections Time / NDRR Interchange / Highway Capacity Manual / North Down River Road bridge / Bridge Road / Impact/Benefit Half interchange / New bridge / /

IndustryTerm

travel speed increases / travel time / travel times / reduced travel time / /

NaturalFeature

Down River / Branch AuSauble River / Street North Down River / Exit Ramp North Down River/Michigan/Roberts North Down River / North Down River / East Branch AuSable River / /

Organization

Mercy Hospital / /

Person

Miles Saved / Alexia Ln / /

Position

River WB / Prime Minister / River Rd WB / West WB / WB / /

Product

Grant Application / M72 / I-75BL / M-72 / M-93 / I-75 / /

ProgrammingLanguage

C / /

ProvinceOrState

North Down / Michigan / /

URL

www.fhwa.dot.gov/ohim/onh00/onh2p3.htm / /

SocialTag