<--- Back to Details
First PageDocument Content
Shire of Macedon Ranges / Solar energy / Macedon /  Victoria
Date: 2015-03-01 18:08:54
Shire of Macedon Ranges
Solar energy
Macedon
Victoria

Saturday, 28 February, 2015 BLACK FOREST TIMBER MILL TO GO SOLAR The Black Forest Timber Mill in Woodend is set to be powered by solar energy thanks to a $100,000 investment by the Andrews Labor Government. In Woodend f

Document is deleted from original location.
Use the Download Button below to download from the Web Archive.

Download Document from Web Archive

File Size: 367,38 KB