Back to Results
First PageMeta Content
Damages / Canada Line / Judicial remedies / Contract law / Liquidated damages


Page 1 of 2 Section[removed]Include (1) if estimated damages equal or exceed $6,000 per hour for a mainline segment or connector closure, (2) for District 7 projects, or (3) if a contingency plan is required.
Add to Reading List

Document Date: 2014-05-29 16:52:04


Open Document

File Size: 17,30 KB

Share Result on Facebook

Currency

USD / /

Facility

facility Route Direction / /

IndustryTerm

bar reinforcing steel / /

Organization

District Division / /

Position

District Traffic Manager / Engineer / Chief / /

Technology

concrete grinding Chip / /

SocialTag