Back to Results
First PageMeta Content
Road safety / Road transport / Rapid Ride / Pedestrian zone / ABQ RIDE / Traffic / U.S. Route 1 in Maryland / Pedestrian crossing / Segregated cycle facilities / Transport / Land transport / Traffic law


Existing Conditions: Transportation 6.0 Transportation Overview The portion of the West Central corridor located within the Plan is approximately 6 miles long. It is designated by the Long Range Roadway System Map (2004)
Add to Reading List

Document Date: 2012-04-06 17:32:25


Open Document

File Size: 4,67 MB

Share Result on Facebook

City

Albuquerque / Old Town / /

Company

Range Roadway System 2004 H S RS CO / RS 86TH ST 0 GE B CO / New Mexico Gas Company / Coors / /

Event

Natural Disaster / /

Facility

Arenal Canal / Unser Transit Center / Airport Drive / Central Bridge / Alvarado Transportation Center / Airport Dr. Unser Blvd. / STREET EU IZ CAR BRID Proposed Minor Arterial Proposed Principal Arterial UNINCORPORATED AREA Facility / Bridge Crossing / Bridge Boulevard / Bridge Blvd / Atrisco Plaza / Bridge Blvd. / /

IndustryTerm

travel lanes / transportation / neighborhood services / community services / trail network / bicycle travel / commuter travel / automobile travel / multimodal transportation environment / retail / transportation improvements / traveler-related services / pedestrian travel / transportation system / /

MarketIndex

Pedestrian Composite / /

NaturalFeature

Tingley Beach / Manzano mountain ranges / Mountain Road Bike Boulevard / Rio Grande / /

Organization

Alvarado Transportation Center / EPC / EPC Chapter / Central and Unser Transit Center / Activity Center / European Union / /

Person

Transit Corridor / LA D YUCCA / /

Position

cyclist / SUN CO ATR IS Collector / Major / General / Proposed Collector / /

SocialTag