<--- Back to Details
First PageDocument Content
Mathematics / Deep foundation / Geotechnical engineering / Structural engineering / Egyptian Ratscrew / Parity / Pile / Mathematical induction / Singly and doubly even / Nim / Patience sorting
Date: 2015-10-31 11:59:43
Mathematics
Deep foundation
Geotechnical engineering
Structural engineering
Egyptian Ratscrew
Parity
Pile
Mathematical induction
Singly and doubly even
Nim
Patience sorting

Honors add-on, Homework #2 solution In the two-person game described for this homework, the players take turns taking rocks off one or both piles, but they must take at least one rock off and cannot take more than one ro

Add to Reading List

Source URL: tandy.cs.illinois.edu

Download Document from Source Website

File Size: 27,84 KB

Share Document on Facebook

Similar Documents

MASTER’S DISSERTATION AT GEOTECHNICAL ENGINEERING DEPARTMENT OF CONSTRUCTION SCIENCES | FACULTY OF ENGINEERING LTH | LUND UNIVERSITY NUMERICAL ANALYSIS OF PILE DRIVING EFFECTS IN SOIL

MASTER’S DISSERTATION AT GEOTECHNICAL ENGINEERING DEPARTMENT OF CONSTRUCTION SCIENCES | FACULTY OF ENGINEERING LTH | LUND UNIVERSITY NUMERICAL ANALYSIS OF PILE DRIVING EFFECTS IN SOIL

DocID: 1uFp9 - View Document

Implementing Per Bak’s Sand Pile Model as a Two-Dimensional Cellular Automaton Leigh Tesfatsion 21 January 2009 Econ 308 Presentation Outline

Implementing Per Bak’s Sand Pile Model as a Two-Dimensional Cellular Automaton Leigh Tesfatsion 21 January 2009 Econ 308 Presentation Outline

DocID: 1uxU0 - View Document

Pile of American Dollar Currency Coins Quarters Dimes Nickels Pennies

Pile of American Dollar Currency Coins Quarters Dimes Nickels Pennies

DocID: 1uwZX - View Document

TRAIN PILE-UP By JACQUI HOCKING THE State Rail Authority has ordered an Investigation Into a near-fatal accident In which two trains smashed Into a car

TRAIN PILE-UP By JACQUI HOCKING THE State Rail Authority has ordered an Investigation Into a near-fatal accident In which two trains smashed Into a car

DocID: 1uwxL - View Document

13  Fig. 1 - Vista di insieme di un molino a tre pile (Diderot e D’Alembert, tav. IV e V Encyclopédie). (fig.1-2), azionati da un albero a camme collegato alla ruota idraulica all’esterno, con bietti di ferro che tr

13 Fig. 1 - Vista di insieme di un molino a tre pile (Diderot e D’Alembert, tav. IV e V Encyclopédie). (fig.1-2), azionati da un albero a camme collegato alla ruota idraulica all’esterno, con bietti di ferro che tr

DocID: 1umSg - View Document