Back to Results
First PageMeta Content
Hydrology / Geomorphology / Fluvial landforms / Rivers / Sedimentology / Sediment / Erosion / Levee / Meander / Water / Earth / Geology


Joint Biological Assessment, Part II River Maintenance Methods Attachment
Add to Reading List

Document Date: 2013-01-23 18:39:45


Open Document

File Size: 316,16 KB

Share Result on Facebook

City

San Antonio / /

Company

Longitudinal Bank Lowering / Bank Line Embayment Bank / Protection/Stabilization Bank / Setback Channel Modification Bank Protection/Stabilization / /

Event

Natural Disaster / /

IndustryTerm

bank failure / bank velocity / near bank velocity / Bank erosion / Plastic grid systems / cellular confinement systems / bank lines / soil cement / line causing significant bank erosion / bank scalloping / stabilized bank / reduced bank erosion / bank / bank stability / bank-full stage elevation / bank full elevation / Bank protection methods / bank shaping / still allowing bank erosion / bank protection material / bank protection / bank height / local bank erosion / cement / Bank lowering / bank stabilization / bank protection/stabilization methods / protected bank / deformable bank lines / bank slope / bank erosion process / re-locating infrastructure / energy / bank elevations / /

NaturalFeature

Cross Channel / Setback Channel Modification Bank Protection/Stabilization Cross Channel / Modification Channel / Pilot Cuts Channel / River Spanning / River Maintenance Methods Attachment channel / /

Organization

National Resources Conservation Service / United States Army / Colorado State University’s Engineering and Research Center / U.S. Fish and Wildlife Service / Washington Department of Fish and Wildlife / /

Position

pilot channel banks / L-head / T-head / /

ProvinceOrState

New Mexico / /

SocialTag