<--- Back to Details
First PageDocument Content
Smart grid / Smart meter / Templestowe /  Victoria / Demand response / Energy / Electric power / Measurement
Date: 2014-02-04 19:59:13
Smart grid
Smart meter
Templestowe
Victoria
Demand response
Energy
Electric power
Measurement

Media release 5 February 2014 United Energy opens voluntary peak demand management trial Up to 4,500 households in the Bulleen/Lower Templestowe area of Melbourne will get a chance to be rewarded for voluntarily reducing

Add to Reading List

Source URL: www.unitedenergy.com.au

Download Document from Source Website

File Size: 227,69 KB

Share Document on Facebook

Similar Documents

Electricity Usage Profile Disaggregation of Hourly Smart Meter Data Bochao Zhao, Lina Stankovic, and Vladimir Stankovic Department of Electronic and Electrical Engineering University of Strathclyde, Glasgow, G1 1XW, UK E

Electricity Usage Profile Disaggregation of Hourly Smart Meter Data Bochao Zhao, Lina Stankovic, and Vladimir Stankovic Department of Electronic and Electrical Engineering University of Strathclyde, Glasgow, G1 1XW, UK E

DocID: 1vrHZ - View Document

Product catalogue White label products for the entire IoT industry Smart home • Smart energy • Healthcare • Building management Gateways • Meter interfaces • Sensors • Relays • Smart plugs

Product catalogue White label products for the entire IoT industry Smart home • Smart energy • Healthcare • Building management Gateways • Meter interfaces • Sensors • Relays • Smart plugs

DocID: 1vnGo - View Document

A	Test	of	Commercially	 Available	Products	for	 Estimating	End	Uses	from	Smart Meter	Data May	14,	2016 Prepared	 by:

A Test of Commercially Available Products for Estimating End Uses from Smart Meter Data May 14, 2016 Prepared by:

DocID: 1vbIk - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a communication module for smart meter which has separate cables for power supply and for PLC. The c

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a communication module for smart meter which has separate cables for power supply and for PLC. The c

DocID: 1vauP - View Document

Smart Meter Pilot Project in Tenaga Nasional Berhad, Malaysia: 3 Different Communication Technology Tested Dato’ Mohandass S. Nair Director, Smart Billing Project Tenaga Nasional Berhad

Smart Meter Pilot Project in Tenaga Nasional Berhad, Malaysia: 3 Different Communication Technology Tested Dato’ Mohandass S. Nair Director, Smart Billing Project Tenaga Nasional Berhad

DocID: 1uZY4 - View Document