Back to Results
First PageMeta Content
Space Shuttle program / Flight controller / Christopher C. Kraft Jr. Mission Control Center / Space Shuttle / Marshall Space Flight Center / Design review / STS-121 / STS-118 / Spaceflight / NASA / NASA facilities


Contract NAS9[removed]ATTACHMENT J-2 GLOSSARY, ACRONYMS AND ABBREVIATIONS
Add to Reading List

Document Date: 2003-02-06 17:28:05


Open Document

File Size: 93,50 KB

Share Result on Facebook

Company

Equipment Processing Contract FEWG Flight Evaluation Working Group / Software Authorization Notice SASR Shuttle Avionics Systems Review / HMF Hypergol Maintenance Facility HW/SW Hardware / Landing LLI Limited / IPL / NVR / Maximum Error Rate MGI Mandatory Government Inspection Manufacturing / /

Event

FDA Phase / Reorganization / /

Facility

Integration Laboratory / Johnson Space Center / Space Station Training Facility / Robotics Planning Facility / Manipulator Development Facility / MCC Facility / Mission Control Center / Stowage Review FRCB Flight Rules Control Board Responsible / Program ITF Integrated Training Facility The Integrated Training Facility / Station Utilization Office / IPS Facility / /

IndustryTerm

software version indentifier / launch site / electronic storage media / payload systems / approved engineering changes to hardware / software variable / software systems / platform software / manufacturing scrap / flight hardware / mission-specific application software / real-time spacecraft operations / continued processing / environment monitoring hardware / application software / post-launch processing / manufacturing / manufacturing standard / /

OperatingSystem

VMS / /

Organization

Orbiter Data Reduction Center / Mockup and Integration Laboratory / Rapid Prototyping Lab / FC Flight Cycle FCE Flight Crew Equipment FCOD Flight Crew Operations Directorate / JSC Emergency Operations Center / DoD Department of Defense DOLILU Day / Configuration Management CMDS Configuration Management Documentation System COD Center Operations Directorate / Mission Control Center / Station mission / SRR Software Requirements Review SRU Shop Replaceable Unit SSC John C. Stennis Space Center / Data C&T Communication and Tracking CCAS Cape Canaveral Air Station CCB/D Configuration Control Board / ISS mission / United Nations / Integration Laboratory / Station Utilization Office / P Government-Furnished Equipment/Material/Property GIDEP Government / IPT Integrated Product Team IPS Installation Provided Service / National Aeronautics and Space Administration / European monetary union / GFE/M/P Government-Furnished Equipment/Material/Property GIDEP Government / ASQC American Society / C&D Command / Johnson Space Center / /

Person

John F. Kennedy / C. Marshall Space / Lyndon B. Johnson / George C. Marshall / Manual One / John C. Stennis / Flight Critical / /

Position

Astronaut / Reporting System MCB Materials Control Board Contractor / the Deputy Director / Space Shuttle Program / level contractor / COTR Contracting Officer / contractor / Shuttle Processing Contract/Contractor / Qualification Contractor / contracting officer / coordinator / Manager I-Load Initialization load Mission-unique / Activities Officer / Officer GSO Guidance Support Officer / Director / Space Shuttle Program / Major / Representative / Dynamics Officer / Marshall Management / Control Contractor data base listing materials / Maintenance Directive Contractor / Fee Determination Official / Marshall / Discrepancy Report Contractor / / Shuttle System Contractor / Controller / /

Product

Shuttle / T-6 / NASA / /

RadioStation

CBT / /

Technology

SMS / Operating System / MRI / Radio Frequency / SAN / Simulation / /

SocialTag