<--- Back to Details
First PageDocument Content
Transportation in the United States / Interstate Highway System / Transportation in Minnesota / I-35W Mississippi River bridge / General contractor / Minnesota State Highway 23 / Design–build / Minnesota Department of Transportation / Interstate 35E / Interstate 35 / Minnesota / Construction
Date: 2014-03-19 12:54:57
Transportation in the United States
Interstate Highway System
Transportation in Minnesota
I-35W Mississippi River bridge
General contractor
Minnesota State Highway 23
Design–build
Minnesota Department of Transportation
Interstate 35E
Interstate 35
Minnesota
Construction

Locked Incentive Date (LID) Evaluation Report

Add to Reading List

Source URL: www.dot.state.mn.us

Download Document from Source Website

File Size: 1,48 MB

Share Document on Facebook

Similar Documents

Transportation Update September 2017 New NDDOT Director appointed Governor Burgum appointed Tom Sorel as the new North Dakota Department of Transportation (NDDOT) Director in August. Sorel served as Minnesota DOT Commiss

DocID: 1u6l2 - View Document

Minnesota Department of Transportation Office of Investment Management TRANSPORTATION RESEARCH SYNTHESIS Research Services Section

DocID: 1rX08 - View Document

Acknowledgements This Design Guide was developed in 2002 with the assistance and guidance of a Task Force, which included members from the Minnesota Department of Transportation, the University of Minnesota, the Consult

DocID: 1rVa6 - View Document

Red Rock Corridor Timeline 1997 – Twin Cities Metropolitan Commuter Rail Feasibility Study This study was conducted by the Minnesota Department of transportation (MnDOT) to determine if the Twin Cities metropolitan are

DocID: 1rN69 - View Document

DRAFT Updated March 11, 2014 Asset Management Outcomes and Needs for STIP Years and Beyond Prepared by Minnesota Department of Transportation

DocID: 1rxdZ - View Document