Pontoon bridges / Washington State Route 520 / Washington State Department of Transportation / Governor Albert D. Rosellini Bridge—Evergreen Point / High-occupancy vehicle lane / Interstate 5 in Washington / Washington State Route 9 / Mount Baker Tunnel / Roads and Transit / Washington / Transportation in the United States / Seattle metropolitan area


What are the current program costs? In 2009, the Washington State Legislature established a program budget cap of $4.65 billion. In 2014, the cost to design and construct all corridor improvements was estimated at $4.3 b
Add to Reading List

Document Date: 2014-09-05 19:01:19


Open Document

File Size: 3,42 MB

Share Result on Facebook

City

Aberdeen / Seattle / /

Company

WSDOT / /

Currency

USD / /

/

Event

M&A / Product Issues / /

Facility

Grays Harbor / Montlake interchange / Bridge Replacement / Existing highway / To Medina Project Floating Bridge / Harbor County / /

IndustryTerm

pontoon site / noise-reduction solutions / transportation solutions / /

NaturalFeature

Evans Creek / Lake Washington / Grass Creek / /

Organization

Washington State Department / WSDOT’s office of Equal Opportunity / Washington State Legislature / /

Person

Washington Transit / George Laue / /

/

Product

materials / /

ProvinceOrState

Grays Harbor County / Washington / /

URL

www.wsdot.wa.gov/projects / www.wsdot.wa.gov/Projects/SR520Bridge / /

SocialTag