Back to Results
First PageMeta Content
Capital expenditure / Operating expense / Asset Management Plan / Economics / Finance / Building block model / Infrastructure / Microeconomics / Capital


Report to the Australian Energy Regulator Murraylink Proposal May 2012: Report on Engineering Issues Final October 19, 2012
Add to Reading List

Document Date: 2012-11-28 02:12:09


Open Document

File Size: 1,78 MB

Share Result on Facebook

City

Victoria / Export / Import / /

Company

CHC Associates Pty Ltd / Is Murraylink / Murraylink / AMP / A.W. Grainger / /

Event

M&A / /

Facility

Plant Refurbishment / Plant Redundancy / Plant Redundancy Murraylink / /

IndustryTerm

extinguisher systems / high voltage electricity / high energy transfer capability / transmission network / summer e.g. communications / lower cost energy / ancillary equipment / telephone conference / water systems / protection systems / /

NaturalFeature

Current Revenue Stream / /

Organization

It / CIGRÉ / International Council on Large Electric Systems / /

Person

Berri / B. Corderoy / /

Position

Director / EXECUTIVE / Major / consultant / Director Page / Director Director / /

Product

IGBT2 modules / IGBT2 / /

PublishedMedium

the AER Review / /

Technology

bipolar transistor / /

SocialTag