Back to Results
First PageMeta Content
Electric power transmission systems / Electromagnetism / Wide area synchronous grid / Electric power transmission / IPS/UPS / Synchronous grid of Continental Europe / Energy / Electric power / European Network of Transmission System Operators for Electricity


ENTSO-E’s Ten Year Network Development Plan Mart Landsberg Convenor Regional Group Baltic Sea Baltic Maritime Spatial Planning Forum, June 17-18, Riga
Add to Reading List

Document Date: 2014-07-24 07:18:40


Open Document

File Size: 3,08 MB

Share Result on Facebook

Company

First call / /

IndustryTerm

electricity transmission / long processing time / main transmission infrastructure / electricity transmission network / electricity causing socioeconomic losses / gas pipeline / energy infrastructure legislation / electricity interconnections / electricity markets / /

NaturalFeature

Baltic Sea / /

Organization

European Union / /

Person

Nat / /

/

Position

General / /

SocialTag