Back to Results
First PageMeta Content
United States Army Corps of Engineers / Navigable servitude / Sacramento River / Sacramento /  California / Flood Control Act / Water Resources Development Act / Geography of California / Real property law / Easement


Corps R E Plan- SRBPP w no tracked changes-30 May 2014.pdf
Add to Reading List

Document Date: 2014-12-23 19:17:43


Open Document

File Size: 2,60 MB

Share Result on Facebook

City

SACRAMENTO / /

Company

Purpose The Sacramento River Bank Protection / Typical Repair Sites Average NFS Cost / A. Need / C. Need / Natomas / Need / B. Need / Rights 1 2 Average NFS Administrative Cost / /

Country

United States / /

Currency

USD / /

Event

Natural Disaster / M&A / Product Recall / Product Issues / /

Facility

U.S. Highway / Sacramento International Airport / /

IndustryTerm

real estate / real estate plan / bank protection plan / construction site / bank protection measures / bank / real estate interests / typical site / flood risk management infrastructure / bank protection / remove equipment / river bank / overall project site / public utilities / bank protection works / acquired real estate / bank erosion measures / /

NaturalFeature

Sacramento River / American river / Sacramento Deep Water Ship Channel / /

Organization

Division of Flood Management / Federal Emergency Management Agency / California Central Valley Flood Protection Board / SACRAMENTO DISTRICT REAL ESTATE DIVISION SOUTH PACIFIC DIVISION / United States Army / Division of Environmental Services / Corps of Engineers / West Sacramento Area Flood Control Agency / California Department of Water Resources / Corps Office / Sacramento Area Flood Control Agency / United States Government / /

Position

ATTORNEY / Counsel / representative / Engineer Regulations / General / /

Product

Natomas Levee System / /

ProvinceOrState

California / SACRAMENTO DISTRICT / /

PublishedMedium

Public Law / /

SocialTag