<--- Back to Details
First PageDocument Content
Highways in New South Wales / Oilfield terminology / Northbourne Avenue / States and territories of Australia / Federal Highway / Drilling rig / Road transport in Australia / Gungahlin / Petroleum / Australian highways
Date: 2014-09-10 01:51:29
Highways in New South Wales
Oilfield terminology
Northbourne Avenue
States and territories of Australia
Federal Highway
Drilling rig
Road transport in Australia
Gungahlin
Petroleum
Australian highways

Construction Notice UPDATE No. 7 SEPTEMBER 2014 About Capital Metro Stage 1: The first stage of light rail in the ACT is a 12 kilometre service along one of Canberra’s busiest and fastest growing corridors; from the ci

Add to Reading List

Source URL: www.capitalmetro.act.gov.au

Download Document from Source Website

File Size: 359,77 KB

Share Document on Facebook

Similar Documents

Bishop Burton and Walkington Liaison Committee (Crawberry Hill)

Bishop Burton and Walkington Liaison Committee (Crawberry Hill)

DocID: 1gE6m - View Document

Review	
  of	
  Environmental	
  Impact	
  Study	
  for	
  Repsol’s	
   Proposed	
  2014	
  Exploratory	
  Offshore	
  Drilling,	
  Canary	
   Islands,	
  Spain.	
  	
     Expert	
  Report	
  	
   P

Review  of  Environmental  Impact  Study  for  Repsol’s   Proposed  2014  Exploratory  Offshore  Drilling,  Canary   Islands,  Spain.       Expert  Report     P

DocID: 1gDWD - View Document

Fracture Characterization  Integrating datasets from complex operations of importance for CO2 storage Braathen, A. and Olaussen, S. on behalf of the project Poster produced by: Senger, K., Ogata, K. and; Braathen, C.

Fracture Characterization Integrating datasets from complex operations of importance for CO2 storage Braathen, A. and Olaussen, S. on behalf of the project Poster produced by: Senger, K., Ogata, K. and; Braathen, C.

DocID: 1grU0 - View Document

Progress Reports  Estimation of Minimum Principal Stress from an Extended Leak-off Test Onboard the Chikyu Drilling Vessel and Suggestions for Future Test Procedures by Weiren Lin, Koji Yamamoto, Hisao Ito, Hideki Masago

Progress Reports Estimation of Minimum Principal Stress from an Extended Leak-off Test Onboard the Chikyu Drilling Vessel and Suggestions for Future Test Procedures by Weiren Lin, Koji Yamamoto, Hisao Ito, Hideki Masago

DocID: 1gpMz - View Document

PRD Energy Announces Operational Update CALGARY, ALBERTA – September 16, 2013, PRD Energy Inc. (

PRD Energy Announces Operational Update CALGARY, ALBERTA – September 16, 2013, PRD Energy Inc. ("PRD" or the "Company") (TSXV: PRD) announced an operational update for the drilling of the Boerger 7A well. After setting

DocID: 1gkt6 - View Document