Electric power distribution / Electric power transmission systems / North American Electric Reliability Corporation / Northeast blackout / Electric power transmission / Generating Availability Data System / Electrical grid / Demand response / Rolling blackout / Electric power / Energy / Electromagnetism


Administrative Case No. 387 Assessment of Kentucky’s Transmission System Vulnerability to Electrical Disturbances Prepared for
Add to Reading List

Document Date: 2005-04-28 13:55:51


Open Document

File Size: 1,88 MB

Share Result on Facebook

City

Jackson / /

Company

Big Rivers Electric Company / Cinergy / Commonwealth Associates Inc. / Commonwenlrli Associates / LG&E Energy / American Electric Power / /

Country

United States / Canada / /

Event

Reorganization / /

Facility

North American Electric Power System / Power System Outage Task Force / /

Holiday

Commonwealth Day / /

IndustryTerm

protective device / prudent transmission utilities / interconnected transmission systems / vegetation management / substation equipment / /

Organization

Kentucky Public Service Commission / Task Force / Canada Power System Outage Task Force / U.S.-CanadaPower System Outage Task Force / North American Electric Reliability Council / East Central Area Reliability Council / Southeastern Electric Reliability Council / Study Task Force / U.S.-Canada Power System Outage Task Force / Tennessee Valley Authority / /

Person

M. Conley R.S. Smith / S.S. Miller / /

ProvinceOrState

Kentucky / Michigan / /

Region

East Kentucky / northeastern United States / midwestern United States / /

Technology

simulation / /

SocialTag