Back to Results
First PageMeta Content
Tunnel boring machine / Toll roads in Australia / Toll tunnels / Tunnel / Airport Link /  Brisbane / States and territories of Australia / Queensland / Construction / Tunnels / Engineering vehicles


Thursday 17 February, 2011 ROCKSY CRACKS THE HALF-WAY MARK The first breakthrough of the two massive Tunnel Boring Machines (TBMs) working on the Airport Link project has occurred deep underground at Wooloowin, announced
Add to Reading List

Document Date: 2013-04-08 21:44:19


Open Document

File Size: 21,99 KB

Share Result on Facebook
UPDATE