<--- Back to Details
First PageDocument Content
Energy / Chemistry / Fuel gas / Infrastructure / Liquefied natural gas / Petroleum production / Dominion Resources / Dominion Cove Point LNG / Natural gas / Fossil-fuel power station / Coal / Fossil-fuel phase-out
Date: 2014-11-27 10:46:12
Energy
Chemistry
Fuel gas
Infrastructure
Liquefied natural gas
Petroleum production
Dominion Resources
Dominion Cove Point LNG
Natural gas
Fossil-fuel power station
Coal
Fossil-fuel phase-out

The Proposed Cove Point Liquefied Natural Gas (LNG) Export Facility would be the 4th Largest Climate Polluter in Maryland i Top CO2 Emitters in Maryland

Add to Reading List

Source URL: www.wearecovepoint.org

Download Document from Source Website

File Size: 155,54 KB

Share Document on Facebook

Similar Documents

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE  FIRST NAME

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE FIRST NAME

DocID: 1vbOj - View Document

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

DocID: 1tdGe - View Document

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

DocID: 1s1gQ - View Document

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

DocID: 1rWbc - View Document

BP Statistical Review of World EnergyAugust 2014

BP Statistical Review of World EnergyAugust 2014

DocID: 1ru6D - View Document