Operation Ring

Results: 54



#Item
1Coin Flipping Cannot Shorten Arithmetic Computations Stasys Jukna Abstract. We use elementary arguments to show that randomization cannot spare even one single ring operation to compute real multivariate polynomials.

Coin Flipping Cannot Shorten Arithmetic Computations Stasys Jukna Abstract. We use elementary arguments to show that randomization cannot spare even one single ring operation to compute real multivariate polynomials.

Add to Reading List

Source URL: lovelace.thi.informatik.uni-frankfurt.de

Language: English - Date: 2018-04-11 14:05:21
    2DESIGN AND FIRST OPERATION OF THE ELECTROSTATIC STORAGE RING, ELISA Søren Pape Møller, ISA, Århus, Denmark 4  -

    DESIGN AND FIRST OPERATION OF THE ELECTROSTATIC STORAGE RING, ELISA Søren Pape Møller, ISA, Århus, Denmark 4 -

    Add to Reading List

    Source URL: www.isa.au.dk

    Language: English
      3Microsoft Word - TAFS 21 Weaning age in beef cattle v1.docx

      Microsoft Word - TAFS 21 Weaning age in beef cattle v1.docx

      Add to Reading List

      Source URL: animalwelfareapproved.org

      Language: English - Date: 2015-06-23 11:41:13
      4Ring of Five IUR Task Group, first international Workshop on surveillance of atmospheric low level radioactivity As a side event of the last ICRER Conference in Barcelona, the Ring of five (Ro5) network has held its firs

      Ring of Five IUR Task Group, first international Workshop on surveillance of atmospheric low level radioactivity As a side event of the last ICRER Conference in Barcelona, the Ring of five (Ro5) network has held its firs

      Add to Reading List

      Source URL: www.iur-uir.org

      Language: English - Date: 2014-10-30 10:28:01
      510. Diagnostic system 10.1 Introduction A synchrotron light source requires a diagnostic system to carry out its commissioning and maintain its design performance during normal conditions of operation. Diagnostic devices

      10. Diagnostic system 10.1 Introduction A synchrotron light source requires a diagnostic system to carry out its commissioning and maintain its design performance during normal conditions of operation. Diagnostic devices

      Add to Reading List

      Source URL: www.sesame.org.jo

      Language: English - Date: 2013-08-31 07:39:36
      64 PF-AR 4-1 Summary of Machine Operation The operation statistics for FY2003 are summarized in Table 1. The total operation time increased greatly to 5,400 hours from 4,667 hours in FY2002 (Fig. 1). Although failure time

      4 PF-AR 4-1 Summary of Machine Operation The operation statistics for FY2003 are summarized in Table 1. The total operation time increased greatly to 5,400 hours from 4,667 hours in FY2002 (Fig. 1). Although failure time

      Add to Reading List

      Source URL: pfwww.kek.jp

      Language: English - Date: 2010-01-05 10:30:46
      7BEAM SWITCHYARD DESIGN AND OPERATION J. L. Harris, S. K. Howry, E. J. Seppi, Editor, and H. A. Weidner

      BEAM SWITCHYARD DESIGN AND OPERATION J. L. Harris, S. K. Howry, E. J. Seppi, Editor, and H. A. Weidner

      Add to Reading List

      Source URL: www.slac.stanford.edu

      Language: English - Date: 2007-06-21 14:55:13
      8Accelerators  ACCELERATORS 1. Machine Operation ……………………………………………………………………………………… 77 2. PF-AR Upgrading Project……………………………………

      Accelerators ACCELERATORS 1. Machine Operation ……………………………………………………………………………………… 77 2. PF-AR Upgrading Project……………………………………

      Add to Reading List

      Source URL: pfwww.kek.jp

      Language: English - Date: 2010-01-05 10:19:02
      92 PF Ring 2-1 Summary of Machine Operations The change in the failure rate, defined as the ratio of failure time to the total operation time, is shown in Fig. 4. The failure rate has been maintained at around 1% over

      2 PF Ring 2-1 Summary of Machine Operations The change in the failure rate, defined as the ratio of failure time to the total operation time, is shown in Fig. 4. The failure rate has been maintained at around 1% over

      Add to Reading List

      Source URL: pfwww.kek.jp

      Language: English - Date: 2010-01-05 10:31:47
      10PF Activity Report 2009 #27  3 PF-AR 3-1 Operation Summary As shown in Fig. 1, the total operation time has remained stable at around 5000 h every year since the full-scale reconstruction of the PF-AR inThe operat

      PF Activity Report 2009 #27 3 PF-AR 3-1 Operation Summary As shown in Fig. 1, the total operation time has remained stable at around 5000 h every year since the full-scale reconstruction of the PF-AR inThe operat

      Add to Reading List

      Source URL: pfwww.kek.jp

      Language: English - Date: 2011-01-27 00:36:27