Reactor Buildings The / Reactor Regulation / Fukushima Daiichi Nuclear Power Station / TEPCO Fukushima Daiichi Nuclear Power Station / Cooperative Company Building / port As of March / Reactor Building / Emergency Response Headquarters / Reactor Buildings / Reactor Building basement / Reactor Building Work / Common Pool Building / /
IndustryTerm
operational management / gas control system / gas phase temperatures / injection equipment / employment insurance / investigation equipment / completed steel frame / steel pipe sheet piles / technology development / radioactive waste processing / Fiber adsorbent purification equipment / steel frame construction / removal equipment / facilities/equipment / steel frame / steel pipe sheet / element technologies / leakage location detection equipment / power station site / gas phase / /
Organization
Council for the Decommissioning of TEPCO Fukushima Daiichi Nuclear Power Station / Nuclear Regulation Authority / International Atomic Energy Agency / Ministry of Economy / Trade and Industry / /
Person
Jan (Note) As / Naomi Hirose / May / Sr / /
Position
President / /
Product
Reactor injection / RPV bottom temperatures Reactor injection / water countermeasure team / water leakage / etc / measures / water treatment / /